Phase I ESA, Lead-Based Paint Inspection, and Asbestos Inspection

farmer project on environmental remediation beside the lake of boulder colorado

March 9, 2017

Farmer Environmental Group recently conducted a Phase I ESA, Lead-Based Paint Inspection, Asbestos Inspection for an apartment community in Boulder, CO, for ongoing maintenance of the building and future renovation projects. The purpose of the Phase I ESA was to identify recognized environmental conditions on upwards of 13 acres. Farmer inspected 27 individual residences for Asbestos Containing Building Materials and Lead-Based Paint.

Recent Projects

Farmer-Houston-

Houston Asbestos Assessment

Vacated Office Asbestos Assessment in Houston October 2022 Licensed professionals from Farmer Environmental Group performed a pre-demolition asbestos assessment in Houston, Texas. In the building

Read More »
Emergency-Abatement-Texas

Emergency Abatement in Rockport

Farmer Environmental Group performed an emergency abatement in a building in Rockport, Texas, after water damage occurred from a toilet overflowing. In the picture, you can see the drying process with drilled vent holes in the wall.

Read More »