Lead and Asbestos removed from a Dallas building

asbestos removal in a building under construction

February 25, 2016

Lead and Asbestos was removed from a Dallas building under construction. The Dallas building began the renovation process which included the asbestos and lead testing. Following the testing,  action was required to remove lead and asbestos.  This oversight was conducted by Farmer Environmental Group’s licensed asbestos inspector, Glen Walker. The scaffolding has been erected for workers to use chemicals and pneumatic needle guns, to remove lead based paint from the frames. The asbestos window caulking has also been removed as part of the renovations.

Recent Asbestos Projects

Farmer-Houston-

Houston Asbestos Assessment

Vacated Office Asbestos Assessment in Houston October 2022 Licensed professionals from Farmer Environmental Group performed a pre-demolition asbestos assessment in Houston, Texas. In the building

Read More »
Emergency-Abatement-Texas

Emergency Abatement in Rockport

Farmer Environmental Group performed an emergency abatement in a building in Rockport, Texas, after water damage occurred from a toilet overflowing. In the picture, you can see the drying process with drilled vent holes in the wall.

Read More »